Lighthouse has a new layout. Prefer the old one? Return to the old layout, and switch back any time from the link at the top of each page.

Potentially lengthy operations should have progress indication

#19

Candidates:

  • groovy-eval of Project.makeProject
  • groovy-eval of .getClasses()
  • the override-methods step of extend/implement

Reported by Espen Wiborg · February 26th, 2009 @ 11:31 PM

State: resolved
Milestone: Second release
Assigned to: Espen Wiborg Espen Wiborg

Activity

  1. Espen Wiborg
    Espen Wiborg
    • State changed from new to open

    (from [22c0c6feba76c864ee2495b7dff21021ed089a62]) Add progress indication to extend/implement [#19 Potentially lengthy operations should have progress indication state:open] http://github.com/espenhw/malaba...

    February 27th, 2009 @ 12:39 AM

  2. Espen Wiborg
    Espen Wiborg
    • Milestone set to Second release

    March 5th, 2009 @ 01:53 AM

  3. Espen Wiborg
    Espen Wiborg
    • State changed from open to resolved

    (from [bb0bcb111850d00acfcce0bbd015400a2205d793]) Give a message when calling out to Groovy [#19 Potentially lengthy operations should have progress indication state:resolved] http://github.com/espenhw/malaba...

    March 8th, 2009 @ 08:55 PM

Please Sign in or create a free account to add a new ticket.

With your very own profile, you can contribute to projects, track your activity, watch tickets, receive and update tickets through your email and much more.